RD&E and North Devon hospital waiting times slashed

It’s still one of lengthiest in the country

Waiting times have been slashed in A&E departments at the Royal Devon and Exeter (RD&E) and North Devon District hospitals, and are now among the best in the country.

Alison Stephenson, local democracy reporter www.radioexe.co.uk 

The Royal Devon University Healthcare NHS Foundation Trust is in the top 10 of most-improved health trusts in the country for urgent emergency care and says it has “exceeded its expectations”.

The end-of-year performance showed 80 per cent of A&E patients were dealt with within four hours. The national target is 76 per cent.

The trust’s chief executive Sam Higginson told a board meeting there is “a sense of growing momentum” for the organisation which was rated as “requires improvement” by the Care Quality Commisson (CQC) last August in its first inspection since the Royal Devon and Exeter NHS Foundation Trust and Northern Devon Healthcare NHS Trust merged the year before.

The financial situation is more stable, with the Integrated Performance Report at the end of the 2023/24 financial year showing its deficit dropped to £27 million after savings of £77 million were made.

Over half of these savings will have an ongoing benefit.

The patient waiting list had reduced by 8,500, and waiting times for cancer diagnosis and of more than 78 weeks for non-urgent care had improved.

But at 75,000 people, the trust still has one of the largest patient waiting lists in the country.

Mr Higginson complimented the 16,000 staff in the two hospitals who had  improved performance during times of challenge and industrial action, but he said there is still a lot to do.

The trust plans to reduce the waiting list by another 10,000 people this year.

“In two-to-three years’ time, I would like to see us back to having a stable waiting list, and in a good financial position within 18 months,” he said.

He said the trust had achieved its best four-hour performance in emergency care since the merger.

A letter from Dame Cally Palmer and Professor Peter Johnson from the NHS Cancer Programme said the trust’s 40 per cent reduction in people waiting more than 62 days from getting a cancer diagnosis to starting treatment –  101 fewer patients than a year ago – was “some of the most positive progress we have seen anywhere nationally.”

There were three ‘must-do’ actions for the trust following the CQC report last year.

To ensure its systems and processes support it to oversee and respond to issues and risks more quickly and ensure learning from incidents, including never events and data issues.
To ensure the information reported from its electronic patient record system is accurate and properly analysed to support regular audits to improve the quality of care.
Achieve a stable financial position and continue to manage pressures so they do not compromise the quality of care.
The CQC reported “compassion and positive teamworking” and found the leadership to be “cohesive, patient centred and knowledgeable about the issues and priorities for the quality and sustainability of services”.

Developer unveils plans for “Grange Area” Cranbrook extension

More new homes for East Devon as a developer unveils plans to build around 500 – some affordable – between Cranbrook and Rockbeare

Becca Gliddon eastdevonnews.co.uk

Plans to build around 500 homes – approximately 75 affordable – a community hall, allotments, play areas and a neighbourhood centre on East Devon land between Rockbeare and Cranbrook have been revealed to the public.

Developer Baker Estates, based in Newton Abbot, this week held two public consultation exhibitions, showcasing its plans for what it has described as ‘residential-led, mixed-use development’ on land to the east of Gribble Lane and south of London Road.

The housebuilder said the site has been allocated for development as part of the Grange Expansion Area within the adopted Cranbrook Plan.

The developer’s proposed plan of the site.

The proposals include around 500 homes, a community hall,  a neighbourhood centre for shops, plus  business use near London Road.

Some 15 per cent of the homes – around 75 – will be affordable and for local people.

Plans shown to the public included multi-use green spaces, plays areas for children, allotments, plus community and ‘amenity’ space.

The developer said the southern part of the site would be left as Suitable Alternative Natural Greenspace (SANG), to ‘provide sustainable opportunities for recreation, with new circular accessible routes created, habitat creation, increasing access to nature, and providing connections provided to the wider landscape’.

Baker Estates said its developments were designed to be walkable, ‘served by good quality pedestrian and cycle links with roads designed to incorporate bus services’.

Graham Hutton, Baker Estates operations director, said: “We received some positive feedback from locals on our outline proposals and we’ll be looking to incorporate some of the suggestions into our proposal before we submit to East Devon District Council.

“An outline application determines the principle of development together with the means of access.

“If successful, we would then prepare more detailed plans which we would share with the community then come back to the community, prior to submitting a number of ‘reserved matters’ planning applications.”