Woodbury: if you don’t want Greendale in your backyard – act NOW

Residents of Woodbury – if you don’t want Greendale Business Park in your back gardens – act NOW!

Here is the necessary information for action:


Woodbury Salterton Residents Association
This reference needs to be attached to all correspondence
APP/01105/C/16/3165341
Representations must be received by 2 May

“At the same time as residents have been asked to comment on an “Employment Zone Boundary” at Greendale Business Park, an “Enforcement Appeal” has been submitted by the owners of Greendale regarding a requirement to remove approximately 3.5Ha of industrial development which have been built without planning permission over the last 2 years.

The Woodbury Salterton Residents Association support East Devon District Council serving a breach of Planning Control. Therefore the Association are asking all Residents to respond to the Planning Inspector by 2nd May.

The details of the appeal are:

Planning Consultation Appeal
Appeal by FWS Carter and Sons

Greendale Business Park Woodbury Salterton EX5 1EW

The appeal arises from the serving of an Enforcement Notice in respect of the unauthorised development which has taken place on the land on the Eastern Boundary at Greendale Business Park.

The breach of planning control

Without planning permission, the construction of four compounds, by the levelling of the land, the laying of hard surfaces using concrete and scalping, enclosing with security fencing, gates, cctv cameras and lighting. The construction of two buildings and the associated use of the land to store a portacabin type temporary building, cubicle, shipping containers, mobile park homes, caravans and other associated items.

The Council considered it expedient to issue the Notice having regard to the provisions of the Development Plan and to other material planning considerations.

Reasons for issuing the Notice

It appears to the Council that the above breach of planning control has occurred within the last four years.

The development, by virtue of its scale and extension beyond the built form of Greendale Business Park and outside of any recognised development boundary, is within the open countryside where new development is strictly controlled. The development represents a sprawling development in the countryside in conflict with the special approach to accommodate industrial development within defined settlements as identified within the Local Plan.

The development also has the potential to impact on the amenity of occupiers of nearby dwellings by virtue of noise and potentially light pollution and potential unacceptable visual impact on the landscape.

The proposal is therefore contrary to the provisions of Strategy 7 (Development in the Countryside), Policy E4 (Rural Diversification), Policy E5 (Small Scale Economic Development in Rural Areas), Policy E7 (Extensions to Existing Employment Sites), Policy D1(Design and Local Distinctiveness), Policy EN14 (Control of Pollution), Policy D2 (Landscape Requirements) and Policy D3 (Trees on Development Sites) of the adopted East Devon Local Plan and guidance within the National Planning Policy Framework.

The requirements of the Notice are to –

1. Permanently remove from the land the concrete hardstanding, foundations and associated drainage works from the compounds 39, 48A and 47

2. Permanently cease the use of the land as compounds and for use of storage of mobile park homes, caravans, shipping containers, portacabin type buildings and storage of associated items.

3. Permanently remove from the land all fencing from the perimeters of and within compounds 39, 48A, 47 and 11.

4. Permanently remove from the land all gates from the perimeters of and within compounds 39, 48A, 47 and 11.

5. Permanently remove from the land all CCTV cameras and supporting ancillary equipment from within compounds 39, 48A, 47 and 11.

6. Permanently remove from the land all light fittings and cabling from compounds 39, 48A, 47 and 11.

7. Permanently remove from the land the two permanent buildings sited within compound 39.

8. Permanently remove from the temporary buildings including the shipping containers.

9. Permanently remove from the land the cubicle.

10. Permanently remove from the land the mobile Park Homes, caravans and associated items.

11 Replace the topsoil in compounds 39, 48A and 47 to a depth of 20cm and reseed with an agricultural grass mix which shall be retained and maintained in perpetuity.

12 Permanently remove to an authorised place of disposal, all materials associated with compliance with steps 1, 3, 4, 5, 6, 7, 8, 9 & 10.

The time for compliance is within six months of the Notice taking effect.

The appellant grounds of appeal.

(a) That planning permission should be granted for what is alleged in the notice, and;

(f) The steps required to comply with the requirements of the notice are excessive and lesser steps would overcome the objection.

Important

There are 2 Consultations ongoing at present at Greendale Business Park.

1. Consultation on a definitive Employment Boundary.

2. Planning Appeal consultation regarding a removal of an enforcement

If you wish to make comments in respect of the appeal, you can do so on
the Planning Portal at https://acp.planninginspectorate.gov.uk or by

emailing teame1@pins.gsi.gov.uk .

Or send three copies to

The Planning Inspectorate Room 3E. Temple Quay
House 2. The Square. Bristol BS1 6PN”

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s